由项目工程师撰写的关于坞修计划、涂层、热作业规范和维修经济效益的现场文章。
我们的技术文章仅以英文发布。
How early repair-list clarification, pre-ordered steel and agreed hot-work permits compress a special survey docking by up to a third.
Surface preparation, dew point control and film thickness records matter more to coating life than the paint specification itself.
Gas-freeing, isolation, fire watch and a permit that reflects the real job — the four conditions we never compromise on tanker steel works.
Some steel and machinery work belongs at sea with a riding squad. Here is where the line falls for commercial tonnage.