
Boxship maintenance
Container Vessel Repair
Cell guide renewal, hatch cover and lashing bridge repair, reefer refits and steel works between voyages.
Container vessels live on schedule. We plan boxship works around the rotation — mobilising to the berth or taking short dockings that return the vessel to service without missing a string.
Cargo-securing and cell guide geometry are surveyed before and after works, with measurement records supplied for class and charterers.
Mode
Berth or short docking
Focus
Schedule integrity
Testing
UT hatch tightness
Scope of work
- Cell guide alignment, cropping and renewal
- Hatch cover, coaming and packing repair
- Lashing bridge and cargo-securing renewal
- Reefer socket and cabling refit
- Hull and deck steel renewal between voyages
- Hatch cover ultrasonic tightness testing
